{"id":3672,"date":"2026-04-14T07:35:00","date_gmt":"2026-04-14T07:35:00","guid":{"rendered":"https:\/\/climatevdo.com\/?p=3672"},"modified":"2026-04-16T06:27:25","modified_gmt":"2026-04-16T06:27:25","slug":"mexico-updates-distributed-generation-rules-to-formally-integrate-energy-storage-pv-magazine-international","status":"publish","type":"post","link":"https:\/\/climatevdo.com\/?p=3672","title":{"rendered":"Mexico updates distributed generation rules to formally integrate energy storage \u2013 pv magazine International"},"content":{"rendered":"<div>\n<div class=\"article-lead-text\">\n<p>The new provisions published by the country\u2019s energy regulator are aimed to adjust the technical and administrative criteria for distributed generation, particularly with regard to energy storage, installed capacity limits, and interconnection procedures.<\/p>\n<\/div>\n<p>                                                                                <time class=\"entry-published updated\" datetime=\"2026-04-14T09:35:07+02:00\" itemprop=\"datePublished\" title=\"Tuesday, April 14, 2026, 9:35 am\">April 14, 2026<\/time><br \/>\n                                            <span class=\"entry-author\" itemprop=\"author\" itemscope=\"itemscope\" itemtype=\"http:\/\/schema.org\/Person\"><a href=\"https:\/\/www.pv-magazine.com\/author\/luis-ini\/\" title=\"Posts by Luis Ini\" class=\"author url fn\" rel=\"author\">Luis Ini<\/a><\/span><\/p><\/div>\n<div>\n<p><strong>From <a href=\"https:\/\/www.pv-magazine-mexico.com\/2026\/04\/13\/la-cre-actualiza-el-marco-regulatorio-para-generacion-distribuida-con-cambios-en-interconexion-y-almacenamiento\/?utm_source=Mexico+%7C+Newsletter&#038;utm_campaign=bbf75c8a64-dailynl_mex&#038;utm_medium=email&#038;utm_term=0_0ca6715135-bbf75c8a64-158946049\" target=\"_blank\" rel=\"noopener\">pv magazine Mexico<\/a><\/strong><\/p>\n<p data-start=\"0\" data-end=\"338\"><a href=\"https:\/\/www.pv-magazine.com\/2025\/11\/26\/new-large-scale-pv-projects-proliferate-in-mexico\/\" target=\"_blank\" rel=\"noopener\">Mexico<\/a>\u2018s Energy Regulatory Commission (CRE) has opened a consultation on proposed changes to the provisions for distributed generation, redefining key elements of the current regulatory framework. The draft introduces technical and operational changes affecting both photovoltaic systems and hybrid configurations with storage.<\/p>\n<p data-start=\"340\" data-end=\"621\">One of the most relevant updates is the explicit inclusion of energy storage within distributed generation facilities. This change formally recognizes battery-equipped systems, which were not clearly defined under the previous framework focused primarily on stand-alone generation.<\/p>\n<p data-start=\"623\" data-end=\"893\">The proposal also revises capacity limits and classification criteria. While the general threshold of up to 500 kW is maintained, it clarifies how capacity is measured (AC or DC) and how hybrid systems are accounted for, addressing ambiguities in the current regulation.<\/p>\n<p data-start=\"895\" data-end=\"1191\">In terms of interconnection, the draft introduces more detailed procedures and technical requirements, including clearer guidance on required studies and stakeholder responsibilities. It also strengthens criteria for grid impact assessments compared to the more general provisions in force today.<\/p>\n<p data-start=\"1193\" data-end=\"1473\">The update further modifies metering and settlement rules, including provisions for surplus energy in systems with storage. This adds operational complexity relative to the existing framework, which is oriented toward instantaneous generation without integrated energy management.<\/p>\n<p data-start=\"1475\" data-end=\"1708\">Additionally, the draft aligns technical definitions with broader electricity-sector regulations, improving regulatory consistency. Several terms are updated to reflect developments in storage technologies and demand-side management.<\/p>\n<p data-start=\"1710\" data-end=\"2020\" data-is-last-node=\"\" data-is-only-node=\"\">Finally, the proposal adjusts timelines and administrative processes for interconnection permits and contracts, clarifying roles for users, suppliers, and grid operators. While these changes aim to reduce procedural uncertainty, they also introduce stricter documentation and technical compliance requirements.<\/p>\n<p data-start=\"1790\" data-end=\"1999\">Mexico\u2019s National Commission for Regulatory Improvement (CONAMER) recently outlined <a href=\"https:\/\/www.pv-magazine.com\/2025\/07\/15\/mexico-introduces-new-rules-for-self-consumption\/\" target=\"_blank\" rel=\"noopener\">requirements<\/a> for obtaining generation permits for interconnected self-consumption at power plants between 0.7 MW and 20 MW.<\/p>\n<p data-start=\"2001\" data-end=\"2168\">In February, President Claudia Sheinbaum unveiled the <a href=\"https:\/\/www.pv-magazine.com\/2025\/02\/06\/mexico-aims-to-deploy-4-67-gw-of-large-scale-pv-by-2030\/\" target=\"_blank\" rel=\"noopener\">National Electric System Expansion Plan<\/a> 2025-30, designed to add 13.02 GW of new power capacity over six years.<\/p>\n<p data-start=\"2170\" data-end=\"2376\" data-is-last-node=\"\" data-is-only-node=\"\">The plan includes nine photovoltaic projects totaling 4.67 GW with a $4.9 billion investment, expected online between 2027 and 2028, and seven wind projects for 2.47 GW requiring $3.2 billion in investment.<\/p>\n<div class=\"disclaimer\">\n<p>This content is protected by copyright and may not be reused. If you want to cooperate with us and would like to reuse some of our content, please contact: <a href=\"http:\/\/www.pv-magazine.com\/cdn-cgi\/l\/email-protection#0224217a34373924217a34363924217a343b3924217a35363924217a34643924217a35303924217a35313924217a36323924217a35323924217a35343924217a30663924217a34663924217a34333924217a34353924217a34333924217a35633924217a343b3924217a34673924217a34373924217a30673924217a34313924217a34643924217a346639\">editors@pv-magazine.com<\/a>.<\/p>\n<\/div>\n<div class=\"mid-article-wpp\">\n<h3>Popular content<\/h3>\n<div class=\"mid-article-wpp__main-content\">\n<div class=\"mid-article-wpp__image\"><a href=\"https:\/\/www.pv-magazine.com\/2026\/04\/15\/vertical-bifacial-pv-outperforms-tilted-pv-systems-in-the-uk\/\" target=\"_self\"><\/a><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The new provisions published by the country\u2019s energy regulator are aimed to adjust the technical and administrative criteria for distributed generation, particularly with regard to energy storage, installed capacity limits, and interconnection procedures. April 14, 2026 Luis Ini From pv magazine Mexico Mexico\u2018s Energy Regulatory Commission (CRE) has opened a consultation on proposed changes to [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3673,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[34],"tags":[],"class_list":["post-3672","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-renewable-energy"],"_links":{"self":[{"href":"https:\/\/climatevdo.com\/index.php?rest_route=\/wp\/v2\/posts\/3672","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/climatevdo.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/climatevdo.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/climatevdo.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/climatevdo.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=3672"}],"version-history":[{"count":1,"href":"https:\/\/climatevdo.com\/index.php?rest_route=\/wp\/v2\/posts\/3672\/revisions"}],"predecessor-version":[{"id":3674,"href":"https:\/\/climatevdo.com\/index.php?rest_route=\/wp\/v2\/posts\/3672\/revisions\/3674"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/climatevdo.com\/index.php?rest_route=\/wp\/v2\/media\/3673"}],"wp:attachment":[{"href":"https:\/\/climatevdo.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=3672"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/climatevdo.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=3672"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/climatevdo.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=3672"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}